February 26, 2006 on 6:03 pm | In News | 1 CommentIt’s been two weeks since the last time we took some pictures at the store, and a lot has been happening! The electrical work is just about done, and so is the plumbing. In both cases, all that’s left is the fixtures and outlets and switches themselves. It’s been great that we’ve been able to design this ourselves and so we can decide where we’re going to need power and phone lines before they’re installed.
- Cross-braces in the ceiling joists
- Scaffolding to install lights in the warehouse
- “Upstairs” above the store and office
- Wiring for the EXIT sign
- Wiring for the security system
- Plumbing in the bathroom
- Plumbing entering the furnace room
- A future radiator